MRP Test Procedure
Contents |
[edit]
Introduction
Based on Procédure de test du MRP.
[edit]
Preparation of the environment
The MRP will work only if the ERP correctly is configured:
- It must exist a nomenclature defining a hierarchy of products (former: Mrp-table)
- The level of nomenclature (Product.billOfMaterialLevel ) of each one produces must be defined
- It must exist a range validates for each produces manufactured treated by the MRP
- All resource used by a range must have an industrial defined calendar (TechDataCalendar)
- Each produces in front of to be treated by the MRP must define the method of réapprovisionnement MRP
- Each produces in front of to be treated by the MRP must have an enter into the management of the stocks
- Generally, it is necessary to authorize the order passation of a product MRP very when there is not sufficiently stock
[edit]
Execution of the MRP
- Pass a sale order of a product being able to be to have treated by the MRP (former: Mrp-table). Important: Specify a date back to wished delivery understood in the planning horizon of the MRP. By default, the planning horizon begins a week after the date back to the day and has a length of a month.
- Go on the page of the MRP and click on to launch the MRP
- If it there had not sufficiently stock, the MRP had to generate suggestions
[edit]
Test procedure detailed for QAA
- Create a sale order for the party
INIT10001- Go to
Order->Order entry - Fill Customer with
INIT10001, clickContinue
- Go to
- Add an order line for the item
MRP-TABLEwith a quantity of 1 and a desired delivery date to2010-10-10 00:00:00.000 - Finalize the order
- Select the shipping address by default and click on to Continue
- Select the delivery method standard and click on to Continue
- Select the offline payment method and click on to Continue
- Do not add additional parties to the order and click on to Continue
- Click on Create order
- Go to
Manufacturing->MRP - Set
From Dateto2010-09-01 00:00:00.000of the planning horizon - Set
Thru Dateto2020-10-20 00:00:00.000of the planning horizon - Click on to
Run the MRP - After a certain time, MRP status will be 'Finished'
- The list of the proposals must be non-emptiness
- Click on To Cancel